All systems are operational

Past Incidents

13th April 2021

No incidents reported

12th April 2021

No incidents reported

11th April 2021

FSVM Core Scheduled maintenance : network core stack resiliency

Estimated timeframe : 14:45-17:00


Actual timeframe : 15:05-16:30


Objective

Reinstate full resiliency of the network core stack, after a decreased resiliency caused by a stack member switch dropout in the iGent datacenter facility following yesterday's firmware upgrade.

Actions

  • investigate stack member dropout
  • remediate on-site (if possible)

Impact

  • During the intervention, full network availability will be maintained where possible. If required, a rolling reboot may inflict a short interruption (1-2 minutes) of specific services.

Mitigation

  • none

10th April 2021

FSVM Core Scheduled maintenance : network firmware upgrade

Estimated timeframe : 15:00-17:00


Actual timeframe : 14:59-17:40


Objective

Upgrade Core and selected network switches to the latest firmware

Actions

  • upgrade & reboot switches
  • observe network connectivity

Impact

  • During the upgrades, internal FSVM1/FSVM2 network and external server connections will be temporarily interrupted.

Mitigation

  • Do prevent data corruption, close network-sourced data and documents
  • Consult this page for status updates

9th April 2021

No incidents reported

8th April 2021

No incidents reported

7th April 2021

No incidents reported