All systems are operational

Past Incidents

11th April 2021

FSVM Core Scheduled maintenance : network core stack resiliency

Estimated timeframe : 14:45-17:00


Actual timeframe : 15:05-16:30


Objective

Reinstate full resiliency of the network core stack, after a decreased resiliency caused by a stack member switch dropout in the iGent datacenter facility following yesterday's firmware upgrade.

Actions

  • investigate stack member dropout
  • remediate on-site (if possible)

Impact

  • During the intervention, full network availability will be maintained where possible. If required, a rolling reboot may inflict a short interruption (1-2 minutes) of specific services.

Mitigation

  • none

10th April 2021

FSVM Core Scheduled maintenance : network firmware upgrade

Estimated timeframe : 15:00-17:00


Actual timeframe : 14:59-17:40


Objective

Upgrade Core and selected network switches to the latest firmware

Actions

  • upgrade & reboot switches
  • observe network connectivity

Impact

  • During the upgrades, internal FSVM1/FSVM2 network and external server connections will be temporarily interrupted.

Mitigation

  • Do prevent data corruption, close network-sourced data and documents
  • Consult this page for status updates

9th April 2021

No incidents reported

8th April 2021

No incidents reported

7th April 2021

No incidents reported

6th April 2021

No incidents reported

5th April 2021

No incidents reported