Estimated timeframe : 2026-04-08 19:00-20:30
Actual timeframe : ??:?? - ??:??
Upgrade the Single Sign On (SSO) to version v26.x
This will result in not being able to log in to multiple services including (but not limited to):
Estimated timeframe : 2026-04-08 17:00-18:30
Actual timeframe : ??:?? - ??:??
Import all PSB meeting locations, past (1 year) and future reservations.
A major outage has disrupted all IRC services ; the cause is being investigated.
14:26 all systems restored
17:48 Some systems seem to have suffered permanent damage ; these will be taken care of during the weekend.
16:20 After power restoration at iGent around noon, most IRC services are back online ; continuing with the border cases.
03:20 A local on-site visit reveals the UGent/DICT Ardoyen iGent datacenter (where the majority of our server infrastructure resides) suffering from a complete power outage. UGent datacenter managers have been informed.
00:55 major disruption
00:27 anomaly with limited scope